OFFSHORE

OFFSHORE

membrane Nitrogen Services for offshore Applications

  • Artificial Lift for Offshore Platforms with Membrane Nitrogen

  • Increase Reserves Without Spending Capex

  • Patented Recirc Nitrogen Units & Dry-Pak Nitrogen Membrane Filter

  • 30% Smaller Footprint

  • Nitrogen replaces produced gas to lift wells and power the platform.

  • Our first artificial lift offshore was for Energy XXI in 2012

  • Hydrate remediation from subsurface lines and pipelines

  • New Platform Commissioning

  • Platform De-commissioning

  • Purging Lines for Safe Repair and Maintenance

  • Offshore Vessel and Barge Purging

  • Nitrogen for Pressurizing Stabilizer Cans

Offshore,Drill,Yellow,Oil,And,Gas,Production,Petroleum,Pipeline.

why nitro-lift?

1. We have been providing unparalleled nitrogen services for over 20 years

  • 1,700,000+ Hours Operating Nitrogen Equipment

  • 200,000+ miles of pipelines purged and tested with nitrogen

  • 22,000+ wells successfully de-watered or lifted in conventional and unconventional plays

  • 500+ Master Service Agreements

  • We pioneered the use of membrane nitrogen in the oil & gas industry in the Barnett Shale in 2006.

  • We have patented equipment and processes in the United States, Canada and Mexico

  • Coverage area includes the lower 48 states, Alaska and the Gulf of Mexico 

2. Notable projects

  • Nitro-Lift conducted the nitrogen “purge & pack” on the Dakota Access pipeline spanning 1,700 miles from the Canadian border to Nederland Texas with generated nitrogen.

  • Nitro-Lift conducted 24 hour nitrogen operations for a major operator in the Gulf of Mexico for hydrate remediation that spanned several weeks.

  • Nitro-Lift conducted 24 hour artificial gas lift operations for Energy XXI to revive a gas stranded offshore platform.