OFFSHORE
membrane Nitrogen Services for offshore Applications
-
Artificial Lift for Offshore Platforms with Membrane Nitrogen
-
Increase Reserves Without Spending Capex
-
Patented Recirc Nitrogen Units & Dry-Pak Nitrogen Membrane Filter
-
30% Smaller Footprint
-
Nitrogen replaces produced gas to lift wells and power the platform.
-
Our first artificial lift offshore was for Energy XXI in 2012
-
Hydrate remediation from subsurface lines and pipelines
-
New Platform Commissioning
-
Platform De-commissioning
-
Purging Lines for Safe Repair and Maintenance
-
Offshore Vessel and Barge Purging
-
Nitrogen for Pressurizing Stabilizer Cans

why nitro-lift?
1. We have been providing unparalleled nitrogen services for over 20 years
-
1,700,000+ Hours Operating Nitrogen Equipment
-
200,000+ miles of pipelines purged and tested with nitrogen
-
22,000+ wells successfully de-watered or lifted in conventional and unconventional plays
-
500+ Master Service Agreements
-
We pioneered the use of membrane nitrogen in the oil & gas industry in the Barnett Shale in 2006.
-
We have patented equipment and processes in the United States, Canada and Mexico
-
Coverage area includes the lower 48 states, Alaska and the Gulf of Mexico
2. Notable projects
-
Nitro-Lift conducted the nitrogen “purge & pack” on the Dakota Access pipeline spanning 1,700 miles from the Canadian border to Nederland Texas with generated nitrogen.
-
Nitro-Lift conducted 24 hour nitrogen operations for a major operator in the Gulf of Mexico for hydrate remediation that spanned several weeks.
-
Nitro-Lift conducted 24 hour artificial gas lift operations for Energy XXI to revive a gas stranded offshore platform.