We Provide Both Liquid & Membrane Nitrogen

For Upstream, Midstream, Downstream and OffShore Operations

OUR 6 CORE

NITROGEN SERVICES

1

PIPELINE-MIDSTREAM

  • DOT Regulated Pipeline Maintenance
  • Pipeline Pigging with Liquid or Membrane Nitrogen
  • New Pipeline Commissioning with Liquid or Membrane Nitrogen
  • Pipeline De-commissioning with Liquid or Membrane Nitrogen
  • New Gas Plant Commissioning– We Pressure Test New Gas Plants with Inert Nitrogen
  • Nitrogen Purging of Gas Plant Lines and Pipelines for Safe Repair and Maintenance
  • Pipeline Cleaning with Nitrogen
  • Filter Vessel Purging with Nitrogen
  • Nitrogen Supply for Pipeline Freezing

2

REFINERY

  • Refinery Services:
  • Nitrogen for Refinery Turn-Arounds
  • Nitrogen Purging of Refinery Lines for Safe Repair and Maintenance
  • Catalyst Cool Down with Nitrogen
  • Catalyst Re-Heat with Nitrogen
  • Heat Exchanger Nitrogen Purges
  • Catalyst Inerting with Nitrogen
  • In Line Inspection (ILI) with Nitrogen
  • Nitrogen for Emergency Outtages
  • Nitrogen for Emergency Response

3

WELLHEAD

  • Drilling, Completion & Production Nitrogen Services:
  • Artifical Lift for Land Based Wells with Patented Nitrogen Recirc Units and Patented Dry-PAK Nitrogen Membrane Units
  • De-Watering
  • Reservoir Pressure Maintenance
  • Well-Jetting
  • Chemical Injection
  • Well Clean Outs
  • Nitro-Lifting
  • Gas Lift Valves – Jet Valves
  • Control Pressure Drilling Assist and Underbalanced Drilling
  • Cementing with Nitrogen
  • Nitrogen Frac

4

OFFSHORE

  • Artificial Lift for Offshore Platforms with Membrane Nitrogen
    • Nitro-Lift Can Show You How to Increase Reserves Without Spending Capex
    • NitroLift brings a distinct competitive advantage for offshore operations with it’s patented Recirc Nitrogen Units and it’s patented Dry-Pak Nitrogen Membrane Units.
    • Each address common offshore issues of footprint and lack of produced gas to produce wells and to power the platform.
    • Our patented units have a 30% smaller footprint vs. competitors as well as a process for lifting wells artificially with less horsepower.
    • Membrane nitrogen is the only economic and logistically viable form of nitrogen for offshore applications.
    • We gained our first experience in this area in 2012 with Energy XXI
  • Hydrate remediation from subsurface lines and pipelines: Our first experience in this area was for Exxon on the Hoover- Diana Platform.
  • New Platform Commissioning: Involves pressure testing new platforms with inert nitrogen.
  • Purging Lines for Safe Repair and Maintenance
  • Offshore Vessel and Barge Purging
  • Nitrogen for Pressurizing Stabilizer Cans

5

EOR - nanoActiv®

6

EMERGENCY
RESPONSE

  • Combustible Bulk Storage Fire Extinguishment and Containment
  • Accomplished by Displacing Oxygen from Storage Facilities with Nitrogen
  • Used in Non-Liquid Firefighting Situations or in Situations as an Assist to Liquid Firefighting
  • Typical Applications: Crude Oil Storage Facilities, Wood Pellet, Grain, Peanut and Pecan Bulk Storage
  • In the Last 24 Months we have Pioneered the use of Nitrogen for this Purpose
  • Provide Multiple Daily Regularly Scheduled Interface with Local and Municipal Authorities, Customer, Customer Insurance Representatives and FEMA
  • Coal Mine Inerting


CUSTOM PROJECTS


GET A QUOTE

OUR 6 CORE

NITROGEN SERVICES

1

PIPELINE-MIDSTREAM

  • DOT Regulated Pipeline Maintenance
  • Pipeline Pigging with Liquid or Membrane Nitrogen
  • New Pipeline Commissioning with Liquid or Membrane Nitrogen
  • Pipeline De-commissioning with Liquid or Membrane Nitrogen
  • New Gas Plant Commissioning– We Pressure Test New Gas Plants with Inert Nitrogen
  • Nitrogen Purging of Gas Plant Lines and Pipelines for Safe Repair and Maintenance
  • Pipeline Cleaning with Nitrogen
  • Filter Vessel Purging with Nitrogen
  • Nitrogen Supply for Pipeline Freezing

2

REFINERY

  • Refinery Services:
  • Nitrogen for Refinery Turn-Arounds
  • Nitrogen Purging of Refinery Lines for Safe Repair and Maintenance
  • Catalyst Cool Down with Nitrogen
  • Catalyst Re-Heat with Nitrogen
  • Heat Exchanger Nitrogen Purges
  • Catalyst Inerting with Nitrogen
  • In Line Inspection (ILI) with Nitrogen
  • Nitrogen for Emergency Outtages
  • Nitrogen for Emergency Response

3

WELLHEAD

  • Drilling, Completion & Production Nitrogen Services:
  • Artifical Lift for Land Based Wells with Patented Nitrogen Recirc Units and Patented Dry-PAK Nitrogen Membrane Units
  • De-Watering
  • Reservoir Pressure Maintenance
  • Well-Jetting
  • Chemical Injection
  • Well Clean Outs
  • Nitro-Lifting
  • Gas Lift Valves – Jet Valves
  • Control Pressure Drilling Assist and Underbalanced Drilling
  • Cementing with Nitrogen
  • Nitrogen Frac

4

OFFSHORE

  • Artificial Lift for Offshore Platforms with Membrane Nitrogen
    • Nitro-Lift Can Show You How to Increase Reserves Without Spending Capex
    • NitroLift brings a distinct competitive advantage for offshore operations with it’s patented Recirc Nitrogen Units and it’s patented Dry-Pak Nitrogen Membrane Units.
    • Each address common offshore issues of footprint and lack of produced gas to produce wells and to power the platform.
    • Our patented units have a 30% smaller footprint vs. competitors as well as a process for lifting wells artificially with less horsepower.
    • Membrane nitrogen is the only economic and logistically viable form of nitrogen for offshore applications.
    • We gained our first experience in this area in 2012 with Energy XXI
  • Hydrate remediation from subsurface lines and pipelines: Our first experience in this area was for Exxon on the Hoover- Diana Platform.
  • New Platform Commissioning: Involves pressure testing new platforms with inert nitrogen.
  • Purging Lines for Safe Repair and Maintenance
  • Offshore Vessel and Barge Purging
  • Nitrogen for Pressurizing Stabilizer Cans

5

EOR - nanoActiv®

6

EMERGENCY
RESPONSE

  • Combustible Bulk Storage Fire Extinguishment and Containment
  • Accomplished by Displacing Oxygen from Storage Facilities with Nitrogen
  • Used in Non-Liquid Firefighting Situations or in Situations as an Assist to Liquid Firefighting
  • Typical Applications: Crude Oil Storage Facilities, Wood Pellet, Grain, Peanut and Pecan Bulk Storage
  • In the Last 24 Months we have Pioneered the use of Nitrogen for this Purpose
  • Provide Multiple Daily Regularly Scheduled Interface with Local and Municipal Authorities, Customer, Customer Insurance Representatives and FEMA
  • Coal Mine Inerting

BY THE NUMBERS

WE LIFT YOU UP
15,000
+

SUCCESSFULLY DE-WATERED OR LIFTED WELLS

IN CONVENTIONAL & UNCONVENTIONAL PLAYS

PIPELINE MILE HIGH CLUB
32,000
+

MILES OF PIPELINE OPERATIONS

MORE THAN 10X THE WIDTH OF THE USA

EQUIPMENT EXPERTS
750,000
+

RUN TIME HOURS OPERATING NITROGEN EQUIPMENT

MSA's
385
+

MASTER SERVICE AGREEMENTS

TRUSTED BY THE BIG BOYS - MAJORS & INDEPENDENTS ALIKE


MORE ABOUT US


GET A QUOTE

BY THE NUMBERS

WE LIFT YOU UP
15,000
+

SUCCESSFULLY DE-WATERED OR LIFTED WELLS

IN CONVENTIONAL & UNCONVENTIONAL PLAYS

PIPELINE MILE HIGH CLUB
32,000
+

MILES OF PIPELINE OPERATIONS

MORE THAN 10X THE WIDTH OF THE USA

EQUIPMENT EXPERTS
750,000
+

RUN TIME HOURS OPERATING NITROGEN EQUIPMENT

SERVICE AGREEMENTS
385
+

MASTER SERVICE AGREEMENTS

TRUSTED BY THE BIG BOYS - MAJORS & INDEPENDENTS ALIKE.

WHO WE'VE WORKED FOR

FROM THE CANADIAN BORDER

TO THE BLUE WATERS OF THE GULF OF MEXICO

WE RUN WITH THE BIG DOGS


MIDSTREAM INDUSTRIAL


OFFSHORE


WELLHEAD COMPLETION


certified_trusted_final-300x300-square