We Provide Both Liquid & Membrane Nitrogen

For Upstream, Midstream, Downstream and OffShore Operations

OUR 6 CORE

NITROGEN SERVICES

1

PIPELINE-MIDSTREAM

  • DOT Regulated Pipeline Maintenance
  • Pipeline Pigging with Liquid or Membrane Nitrogen
  • New Pipeline Commissioning with Liquid or Membrane Nitrogen
  • Pipeline De-commissioning with Liquid or Membrane Nitrogen
  • New Gas Plant Commissioning– We Pressure Test New Gas Plants with Inert Nitrogen
  • Nitrogen Purging of Gas Plant Lines and Pipelines for Safe Repair and Maintenance
  • Pipeline Cleaning with Nitrogen
  • Filter Vessel Purging with Nitrogen
  • Nitrogen Supply for Pipeline Freezing
2

REFINERY

  • Refinery Services:
  • Nitrogen for Refinery Turn-Arounds
  • Nitrogen Purging of Refinery Lines for Safe Repair and Maintenance
  • Catalyst Cool Down with Nitrogen
  • Catalyst Re-Heat with Nitrogen
  • Heat Exchanger Nitrogen Purges
  • Catalyst Inerting with Nitrogen
  • In Line Inspection (ILI) with Nitrogen
  • Nitrogen for Emergency Outtages
  • Nitrogen for Emergency Response
3

WELLHEAD

  • Drilling, Completion & Production Nitrogen Services:
  • Artifical Lift for Land Based Wells with Patented Nitrogen Recirc Units and Patented Dry-PAK Nitrogen Membrane Units
  • De-Watering
  • Reservoir Pressure Maintenance
  • Well-Jetting
  • Chemical Injection
  • Well Clean Outs
  • Nitro-Lifting
  • Gas Lift Valves – Jet Valves
  • Control Pressure Drilling Assist and Underbalanced Drilling
  • Cementing with Nitrogen
  • Nitrogen Frac
4

OFFSHORE

  • Artificial Lift for Offshore Platforms with Membrane Nitrogen
    • Nitro-Lift Can Show You How to Increase Reserves Without Spending Capex
    • NitroLift brings a distinct competitive advantage for offshore operations with it’s patented Recirc Nitrogen Units and it’s patented Dry-Pak Nitrogen Membrane Units.
    • Each address common offshore issues of footprint and lack of produced gas to produce wells and to power the platform.
    • Our patented units have a 30% smaller footprint vs. competitors as well as a process for lifting wells artificially with less horsepower.
    • Membrane nitrogen is the only economic and logistically viable form of nitrogen for offshore applications.
    • We gained our first experience in this area in 2012 with Energy XXI
  • Hydrate remediation from subsurface lines and pipelines: Our first experience in this area was for Exxon on the Hoover- Diana Platform.
  • New Platform Commissioning: Involves pressure testing new platforms with inert nitrogen.
  • Purging Lines for Safe Repair and Maintenance
  • Offshore Vessel and Barge Purging
  • Nitrogen for Pressurizing Stabilizer Cans
5

EOR - nanoActiv®

6

EMERGENCY
RESPONSE

  • Combustible Bulk Storage Fire Extinguishment and Containment
  • Accomplished by Displacing Oxygen from Storage Facilities with Nitrogen
  • Used in Non-Liquid Firefighting Situations or in Situations as an Assist to Liquid Firefighting
  • Typical Applications: Crude Oil Storage Facilities, Wood Pellet, Grain, Peanut and Pecan Bulk Storage
  • In the Last 24 Months we have Pioneered the use of Nitrogen for this Purpose
  • Provide Multiple Daily Regularly Scheduled Interface with Local and Municipal Authorities, Customer, Customer Insurance Representatives and FEMA
  • Coal Mine Inerting

OUR 6 CORE

NITROGEN SERVICES

1

PIPELINE-MIDSTREAM

  • DOT Regulated Pipeline Maintenance
  • Pipeline Pigging with Liquid or Membrane Nitrogen
  • New Pipeline Commissioning with Liquid or Membrane Nitrogen
  • Pipeline De-commissioning with Liquid or Membrane Nitrogen
  • New Gas Plant Commissioning– We Pressure Test New Gas Plants with Inert Nitrogen
  • Nitrogen Purging of Gas Plant Lines and Pipelines for Safe Repair and Maintenance
  • Pipeline Cleaning with Nitrogen
  • Filter Vessel Purging with Nitrogen
  • Nitrogen Supply for Pipeline Freezing
2

REFINERY

  • Refinery Services:
  • Nitrogen for Refinery Turn-Arounds
  • Nitrogen Purging of Refinery Lines for Safe Repair and Maintenance
  • Catalyst Cool Down with Nitrogen
  • Catalyst Re-Heat with Nitrogen
  • Heat Exchanger Nitrogen Purges
  • Catalyst Inerting with Nitrogen
  • In Line Inspection (ILI) with Nitrogen
  • Nitrogen for Emergency Outtages
  • Nitrogen for Emergency Response
3

WELLHEAD

  • Drilling, Completion & Production Nitrogen Services:
  • Artifical Lift for Land Based Wells with Patented Nitrogen Recirc Units and Patented Dry-PAK Nitrogen Membrane Units
  • De-Watering
  • Reservoir Pressure Maintenance
  • Well-Jetting
  • Chemical Injection
  • Well Clean Outs
  • Nitro-Lifting
  • Gas Lift Valves – Jet Valves
  • Control Pressure Drilling Assist and Underbalanced Drilling
  • Cementing with Nitrogen
  • Nitrogen Frac
4

OFFSHORE

  • Artificial Lift for Offshore Platforms with Membrane Nitrogen
    • Nitro-Lift Can Show You How to Increase Reserves Without Spending Capex
    • NitroLift brings a distinct competitive advantage for offshore operations with it’s patented Recirc Nitrogen Units and it’s patented Dry-Pak Nitrogen Membrane Units.
    • Each address common offshore issues of footprint and lack of produced gas to produce wells and to power the platform.
    • Our patented units have a 30% smaller footprint vs. competitors as well as a process for lifting wells artificially with less horsepower.
    • Membrane nitrogen is the only economic and logistically viable form of nitrogen for offshore applications.
    • We gained our first experience in this area in 2012 with Energy XXI
  • Hydrate remediation from subsurface lines and pipelines: Our first experience in this area was for Exxon on the Hoover- Diana Platform.
  • New Platform Commissioning: Involves pressure testing new platforms with inert nitrogen.
  • Purging Lines for Safe Repair and Maintenance
  • Offshore Vessel and Barge Purging
  • Nitrogen for Pressurizing Stabilizer Cans
5

EOR - nanoActiv®

6

EMERGENCY
RESPONSE

  • Combustible Bulk Storage Fire Extinguishment and Containment
  • Accomplished by Displacing Oxygen from Storage Facilities with Nitrogen
  • Used in Non-Liquid Firefighting Situations or in Situations as an Assist to Liquid Firefighting
  • Typical Applications: Crude Oil Storage Facilities, Wood Pellet, Grain, Peanut and Pecan Bulk Storage
  • In the Last 24 Months we have Pioneered the use of Nitrogen for this Purpose
  • Provide Multiple Daily Regularly Scheduled Interface with Local and Municipal Authorities, Customer, Customer Insurance Representatives and FEMA
  • Coal Mine Inerting

BY THE NUMBERS

WE LIFT YOU UP
+

SUCCESSFULLY DE-WATERED OR LIFTED WELLS

IN CONVENTIONAL & UNCONVENTIONAL PLAYS

PIPELINE MILE HIGH CLUB
+

MILES OF PIPELINE OPERATIONS

MORE THAN 10X THE WIDTH OF THE USA

EQUIPMENT EXPERTS
+

RUN TIME HOURS OPERATING NITROGEN EQUIPMENT

MSA's
+

MASTER SERVICE AGREEMENTS

TRUSTED BY THE BIG BOYS - MAJORS & INDEPENDENTS ALIKE

BY THE NUMBERS

WE LIFT YOU UP
+

SUCCESSFULLY DE-WATERED OR LIFTED WELLS

IN CONVENTIONAL & UNCONVENTIONAL PLAYS

PIPELINE MILE HIGH CLUB
+

MILES OF PIPELINE OPERATIONS

MORE THAN 10X THE WIDTH OF THE USA

EQUIPMENT EXPERTS
+

RUN TIME HOURS OPERATING NITROGEN EQUIPMENT

SERVICE AGREEMENTS
+

MASTER SERVICE AGREEMENTS

TRUSTED BY THE BIG BOYS - MAJORS & INDEPENDENTS ALIKE.

WHO WE'VE WORKED FOR

FROM THE CANADIAN BORDER

TO THE BLUE WATERS OF THE GULF OF MEXICO

WE RUN WITH THE BIG DOGS

certified_trusted_final-300x300-square